Once the structure is complete, the phase that defines how a building looks and feels begins: finishing. It is also where costs vary most, because they depend on the finishing level and materials chosen. Clear specifications before starting are the most important step.
Finishing levels
Economy
Practical, cost-effective materials: standard-size ceramic or porcelain, regular paint, simple ceilings and good-quality sanitary fittings. Suited to investment and rental buildings.
Mid-range
Large-format porcelain, gypsum-board ceilings with simple designs and concealed lighting, better paint and sanitary fittings. The most requested option for residential villas.
Premium
Marble floors and cladding, custom ceilings with track lighting, high-spec doors and windows, and fully fitted washrooms. Suited to private villas, reception halls, hotels and head offices.
The right order of finishing works
- Electrical, plumbing and HVAC runs in walls and ceilings.
- Internal and external plastering and insulation.
- Suspended and gypsum-board ceilings.
- Floors and cladding.
- Paint coats.
- Lighting, sanitary fittings and doors.
- Cleaning and handover.
Following this order avoids breaking finished work, such as opening a gypsum ceiling to add a forgotten run.
Office and head-office fit-outs
Offices have different needs: open workspaces, meeting rooms, linear lighting suited to work, and sometimes exposed ceilings that show the ductwork by design. We have delivered head-office fit-outs with these elements.
Tips before you start
- Agree a written specification for each item: type, size, and brand or equivalent.
- Ask for samples of the main materials before supply.
- Ask how cracks and joints will be treated before painting.
- Make sure the quote states what each item includes and what is out of scope.
We deliver finishing at every level for villas, offices and halls in Riyadh and across the Kingdom. Send us your drawings and the finishing level you want on WhatsApp to arrange a site visit.
